Dan Cook bridge

One of my volunteer projects on Mt Diablo was helping to replace an old rotted wooden bridge with a new pre-fabricated one.
2014-11 Summit trail bridge (100) Demo'ing the old bridge
Demo'ing the old bridge
2014-11 Summit trail bridge (200) Leveling
Leveling
2014-11 Summit trail bridge (300) Forming the abutments
Forming the abutments
2014-11 Summit trail bridge (400) Forming the abutments
Forming the abutments
2014-11 Summit trail bridge (500) The pour
The pour
2014-11 Summit trail bridge (600) The pour
The pour
2014-11 Summit trail bridge (700) The pour
The pour
2014-11 Summit trail bridge (800) The pour
The pour
2014-11 Summit trail bridge (1100) The bridge was dragged down Dan Cook trail from Rock City using a backhoe and a bulldozer
The bridge was dragged down Dan Cook trail from Rock City using a backhoe and a bulldozer
2014-11 Summit trail bridge (1200) Setting up the ziplines and pulley
Setting up the ziplines and pulley
2014-11 Summit trail bridge (1300) Setting up the ziplines and pulley
Setting up the ziplines and pulley
2014-11 Summit trail bridge (1)
2014-11 Summit trail bridge (2)
2014-11 Summit trail bridge (1400)
2014-11 Summit trail bridge (1500)
IMAG1726
IMAG1727
IMAG1728
IMAG1725
2014-11 Summit trail bridge (1000) In place (photo courtesy of Carl Nielsen) Dan Cook Trail
In place (photo courtesy of Carl Nielsen)
Dan Cook Trail

Places